Open the cost explorer →

A small heat pump with an electric element is the cheapest way to heat this building's water

We simulated about 25,000 plant-years to find the heat pump, element and storage combination that serves a fixed 1000 MJ/day load at the lowest 15-year cost. A 25 kW heat pump with a 20 kW element and 500 litres beats the best plant without an element in almost every condition we tested, and TRNSYS measures the same gap. Two prices we do not yet have decide whether it always does.

15-year cost of the two best plants, Melbourne, 1000 MJ/day

Hybrid
Without an element
Equipment, paid on day one Electricity over 15 years
16%cheaper over 15 years43%less equipment+2.5%electricity22 to 38%cheaper when daily demand varies

What we found

  1. A hybrid plant is the cheapest way to serve this load. About 25 kW of heat pump, 500 L of storage and a 20 kW element costs over 15 years. The best plant without an element (40 kW, 1,500 L) costs .
  2. It wins on equipment, not efficiency. It uses about 2.5% more electricity, but its equipment costs 43% less. The element covers the peak at a fraction of the cost of heat pump capacity.
  3. It wins by more when real demand varies. On days heavier than the scheme profile, plants without an element fail to hold 45 °C unless they grow to 50 to 80 kW and 2,000 to 3,000 L. The hybrid only needs a bigger element, which is cheap.
  4. Three things can reverse it: an all-in element price near A$2,000/kW, a demand charge near A$45/kW/month, or an element thermostat deadband near 12 K. Tariff, discount rate, heat pump price, climate and building size change how much the hybrid saves, never whether it saves.
  5. The sizing rule is simple. Per 1,000 MJ/day: 25 kW of heat pump, 500 L, and 20 kW of element, rising to 45 to 60 kW where demand varies a lot. Set the element setpoint at 45 °C plus its deadband.
  6. TRNSYS agrees on the cost gap and on delivery. It also found a thermostat layout problem in our first setup, which we have corrected.

The question

Given a building with a fixed daily load and load profile, which combination of heat pump capacity, element capacity and storage delivers the load at the lowest 15-year spend?

The usual instinct is to size the heat pump to carry the whole load, because it is the efficient part of the plant. Our hypothesis was that a smaller heat pump plus an electric element would serve the same load for less money, because heat pump capacity is expensive and the element only needs to cover the peak.

Load
1000 MJ/day on the VEU Activity 44A commercial profile: a morning peak, weekday and seasonal swing
Climate
Melbourne (zone 4), plus six other zones including Auckland and Dunedin
Plant
R290 air-source heat pump, parallel storage vessels, immersion element at 25% of the vessel volume from the top
Swept
Heat pump 10 to 120 kW, storage 250 to 6,000 L, element 0 to 90 kW, element setpoint 45 to 65 °C, heat pump setpoint 55 to 70 °C
A design passes if
Delivery never falls below 45 °C, savings are at least 60% against an electric water heater, weekly sanitation succeeds, and the compressor starts at most 24 times a day and runs at least 15 minutes per start
Cost
Equipment at Australian supplier list prices (heat pump A$965/kW, vessels A$7.97/L, auxiliary 22%, element A$44/kW), installation excluded. Electricity A$0.20/kWh flat for 15 years, no discounting unless stated

The answer

Hybrid

over 15 years

Best without an element

over 15 years
Where the 15-year money goes. Equipment is paid on day one; electricity is the 15-year bill.

The cheapest hybrid on the full grid uses an even smaller 250 L store (), but at 23 compressor starts a day it sits right on our cycling limit. The 500 L design costs 1% more and starts the compressor half as often, so we use it as the reference. Everything from 250 to 600 L is within 2% of the minimum.

With interest on money

The headline is undiscounted. Discounting shrinks future bills relative to day-one equipment, which favours the plant that spends less up front.

Why the hybrid wins

A$11.8kper extra 10 kW of heat pump

Equipment cost rises steeply with heat pump capacity, while electricity hardly moves anywhere between 25 and 120 kW. Capacity is what costs money.

+2.5%electricity, almost the same

A smaller, cooler store loses less heat and lifts the heat pump's COP. The element's COP of 1 costs slightly more than both gains together.

setpoint − 5 Kis the delivery floor

The element holds the top of the store at its cut-in temperature. Set it at 50 °C and delivery never falls below 45 °C.

Capacity is what costs money

Best hybrid at that heat pump sizeBest plant without an element
Cheapest passing design at each heat pump size, with storage and element free to vary. Below 30 kW only a hybrid can pass at all. Above 50 kW the element is no longer needed, and every extra 10 kW adds about A$12k.

Same electricity, different mix

Annual electricity for the two reference designs. The hybrid's compressor uses about 2,900 kWh less; its element adds about 3,700 kWh.

The element holds the delivery floor

In every winning hybrid the lowest delivery temperature equals the element's cut-in: its setpoint minus the 5 K deadband. That makes "passes 45 °C" a choice of setpoint, provided the element is large enough to hold it on the worst morning. It also explains why the cheapest design has no margin: it puts the cut-in exactly on the requirement. A 5 K margin (setpoint 55 °C) costs about A$2,200 over 15 years.

Lowest delivery temperature against element setpoint, for a 25 kW heat pump, 300 L and a 30 kW element. Grey bars fail the 45 °C requirement.

Storage buys fewer compressor starts, not energy

Best hybridBest without an element
Cheapest passing design at each storage volume. For the hybrid, going from 250 to 1,000 L saves A$1.9k of electricity and adds A$7.3k of vessels. The store earns its place by protecting the compressor, not by saving energy.

The whole design space

Every cell is the cheapest design at that heat pump size and storage volume that passes every rule. The two outlined cells are the cheapest hybrid and the cheapest plant without an element. Hover for values.

15-year spend in A$k; darker is cheaper. Empty cells have no passing design, or were not simulated (25 kW was run only up to 1,000 L).

What can change the answer

We re-priced the same simulations under every cost assumption, and re-simulated the plant under every control, hardware, climate and load change. Each test re-optimises both the hybrid and the plant without an element.

FactorRange testedHybrid savingCan it reverse the result?
Element all-in priceA$44 to 4,000 per kW16% to −11%Yes near A$2,000/kW
Demand chargeA$0 to 60 per kW per month16% to −5%Yes near A$45, or A$65 at 7% discount
Element deadband2 to 12 K15% to 0%Yes near 12 K
Draw shapeflat day to burst day5% to 27%Nearly on a flat day
Demand variancenone to 30% day to day16% to 38%No it raises the saving
Electricity priceA$0.10 to 0.60/kWh28% to 6%No
Discount rate0 to 10%16% to 28%No
Heat pump price, equipment discountA$779 to 1,600/kW; 70 to 115% of list12% to 22%No
Climate, load size, COP, pipe length, heat pump deadband7 zones; 500 to 4,000 MJ/day10% to 16%No
Element position, compressor timers, tank loss, vessel size, certificates, sanitationwithin 2 pointsNo

Cost assumptions, one at a time

Hybrid saving against the best plant without an element, re-optimised at every point. Only the element price crosses zero.

The two prices that decide it

Element price and demand charge are the only costs that can each reverse the result on their own, and they compound. The map shows the hybrid saving for every combination: orange where the hybrid is cheaper, blue where a plant without an element is, and a heavy line at break-even.

Undiscounted, A$0.20/kWh. Demand charge billed on the monthly 30-minute peak, measured on 212 designs. A bare immersion element is about A$44/kW; what a project pays for the element with its contactors, switchgear and cabling is the number we need.
Why the demand charge bites. The hybrid's measured peak is about 21 kW against 13 kW for the plant without an element. A 30 kW element adds only about 9 kW to the peak, because it cycles and seldom runs flat out alongside the compressor for half an hour. A high demand charge also lets the plant without an element shrink its heat pump and grow its store, a move the hybrid cannot copy.

Real days are not the scheme day

The scheme test uses one repeating day. Real buildings have heavy days. We ran 312 designs on four seeded years of varying demand each, and kept only the designs that hold 45 °C on every day of every year.

Hybrid designs that surviveDesigns without an element that survive
The element is insurance. A plant without an element cannot buy its way out of variable demand: at 30% day-to-day variance only one of 24 such designs survives, at 80 kW and 3,000 L. The hybrid survives by growing its element from 20 kW to 45 or 60 kW, which costs little. The break-even element price stays near A$2,000/kW whatever the variance.

Where it holds

Hybrid saving on the 162-design mini-grid (heat pump 15 to 50 kW, storage 500 to 1,500 L, element 0 to 45 kW), one change at a time. The dashed line is the base case. Grey rows: nothing passes on the mini-grid.

Two results stand out. A flat daily draw leaves little peak for the element to shave, and the saving drops to 5%. A wide element deadband lowers the delivery floor one-for-one, and at 12 K the hybrid needs so high a setpoint that it loses its advantage. The burst day, half the daily volume in three morning hours, passes nothing on the mini-grid; on a wider grid the hybrid is 27% cheaper, but with a 90 kW element on a 60 kW heat pump.

Does TRNSYS agree?

Four designs were rendered into the TRNSYS 15 and TRNSYS 18 template libraries and run through the production harness at the standard 0.02 h timestep.

DesignEngineLowest deliverySavingsElectricityElement
Hybrid
25 kW, 500 L, 20 kW element
Python45.02 °C66.8%115.3 GJ13.3 GJ
TRNSYS 1545.07 °C66.3%116.9 GJ12.3 GJ
TRNSYS 1845.1 °C66.3%116.8 GJ12.4 GJ
Without an element
40 kW, 1,500 L
Python48.99 °C67.6%112.5 GJ0
TRNSYS 1547.71 °C66.7%115.3 GJ0
TRNSYS 1848.3 °C66.8%115.3 GJ0
  1. The cost gap is the same. 15.9% in TRNSYS 15, 16.0% in TRNSYS 18, 15.6% in the Python engine.
  2. The engine does not over-credit the element. It reports 3 to 9% more element energy than TRNSYS. TRNSYS uses 1.3 to 2.5% more electricity overall, which traces to its own heat pump loop.
  3. The thermostat position matters. With the element thermostat above the element, TRNSYS cannot run the hybrid at 20 tank nodes. With it below, everything converges and the hybrid holds 45 °C up to about 1,300 MJ/day.
  4. The plant without an element is marginal at 20 nodes. TRNSYS 15 fails it at 44.5 °C, which would make the hybrid's advantage larger in the production template, not smaller.

What we corrected on the way

What we first thoughtWhat the tests showed
The 60% savings rule limits how small the heat pump can go.Not at the optimum. Heat pump size is an economic balance; the rule only binds when electricity is cheap.
Thermostat one node above the element, the textbook layout.This layout stalls the heater routine in TRNSYS and the engine. We moved it below the element; the cost answer did not change.
Designs below 500 L could not be simulated.That was the thermostat layout. They run, and the 250 L design is real, but it sits on the compressor cycling limit.
Sanitation would limit small heat pumps.It never binds, at any size.
Two hard rules, compressor cycling and sanitation, were enough.Element cycling matters too. Elements of 45 kW and above run 3 to 4 minute bursts about six times a day.

What is not settled, and next steps

Not yet established
  • The all-in installed price of a staged element with its control gear.
  • The demand-charge structure the audience actually pays.
  • Element staging. The engine has one element at one capacity; large elements would really be several stages, which would also fix their short bursts.
  • Size-dependent heat pump efficiency. One performance map is scaled to every size.
  • A TRNSYS check of the designs that survive variable demand, and of New Zealand climates.
  • Installation cost, excluded by decision.
Next steps
  1. Get an electrical contractor's price for a 30 kW and a 60 kW staged element, installed.
  2. Pick a representative NZ commercial tariff and its demand charge.
  3. Add a staged element to the engine and re-run the variable-demand tests.
  4. Run a variance-proof hybrid in TRNSYS at 10 and 20 nodes.
  5. Present the method and the break-even map, rather than any single design, as the result.

Explore every result yourself

Basis and method

Engine. The EnergyAE Python commercial hot water engine, pinned at one version, with a full-year simulation for every design at a 0.02 h timestep. About 4% of designs needed a finer timestep (0.01 or 0.005 h) to converge; each result records which it used. Spot checks show the finer timestep changes electricity by 0.3% on average.

Plant model. One R290 heat pump with a normalised performance map scaled to each capacity, a fixed 5 K temperature rise across the heat pump, parallel vessels of up to 1,000 L, an immersion element at 25% of vessel volume from the top with its thermostat one node below, the element allowed to run alongside the heat pump, a heat pump setpoint of 65 °C with a 5 K deadband, a weekly sanitation cycle, and compressor timers of 10 minutes on and 5 off.

Costs. Equipment at Australian supplier list prices compiled in 2026, supply only, ex GST: heat pump A$965/kW (range A$779 to 1,150), storage vessels A$7.97/L up to 1,000 L each, auxiliary equipment 22% of heat pump and vessels, immersion element A$44/kW. Installation excluded. Electricity A$0.20/kWh flat. Certificates are not in the headline; at a fixed registered load they are worth about A$14k for every design and do not change the ranking.

Variable demand. The engine's own generator perturbs each day's volume (lognormal, correlated day to day) and timing, keeping the annual energy unchanged. Four seeded years per design.

Record. Every test, in the order it was run, with its result and what it taught us, is kept in the EnergyAE simulation log for this study.