EnergyAE / Knowledge Base

Project Initiation Checklist

Setup checklist for residential SWH modelling projects.

Use this checklist immediately after quote acceptance. Do not begin modelling until the project identity, document pathway, and portal/signatory responsibilities are clear.

Checklist

  • Project code assigned
  • SharePoint folder created from the residential modelling template
  • Monday.com item created using the SWH modelling template
  • Client kickoff email sent
  • Brand and system list confirmed
  • Target schemes confirmed: CER, VEU, ESS
  • Testing status recorded for AS/NZS 2535.1 (collector), AS/NZS 4692 (tank), potable water, and electrical safety
  • Certification status recorded for AS/NZS 2712 and EESS
  • CER, VEU, and IPART/TESSA portal access requirements checked
  • Authorised signatory details confirmed or requested
  • Out-of-scope items recorded

Exit gate

The checklist passes when every item is green or has a named owner and due date.

Proceed to Client Kickoff Form, then Portal Access Setup.