0. Quotation

How to scope and quote a residential HPWH modelling project before project initiation.

Phase 0 turns an enquiry into a confirmed scope and accepted quote. It is usually director-led because the quote needs to fix the model list, schemes, testing status, certification status, and submission responsibility before project work starts.

Inputs

Before quoting, request a scope table from the client showing:

  • Brand and model name for each HPWH being submitted
  • Model description, tank volume, refrigerant, compressor type, and system type
  • Target schemes: CER/SRES, VEU, ESS, or a combination
  • Whether AS/NZS 5125.1, AS/NZS 4692, potable water, and electrical safety testing is complete
  • Whether AS/NZS 2712 certification is complete, underway, or not started
  • Whether the client already has CER, VEU, and IPART/TESSA accounts
  • Whether EnergyAE will submit applications or only provide modelling/audit files

Phase sub-tasks

  1. Confirm project scope and model list.
  2. Confirm target schemes and EnergyAE submission responsibility.
  3. Confirm testing and certification status.
  4. Identify out-of-scope items such as retesting, certification body management, extra model variants, or regulator RFI rounds beyond the quote.
  5. Prepare and issue the quote in Xero — refer to Pricing for current rates and How to use Xero for quoting instructions.

Exit gate

Phase 0 exits when:

  • Quote has been issued through Xero
  • Client has accepted the quote
  • Project-start approval has been confirmed
  • Phase 1 Project Initiation can begin

Once accepted, move immediately to Phase 1 - Project Initiation.