EnergyAE / Knowledge Base

Gate B Review

Peer review checklist for application files before scheme submission.

Gate B review occurs at the end of audit file preparation, after all application files are ready for submission (CER, VEU, ESS). A 100% pass rate is required before submission.

Review Standards

Stop immediately if any check fails. Exception: minor/aesthetic issues that don’t affect the application (e.g., PDF formatting).

For each failure, clearly state the specific issue:

  • “AS/NZS 2712 certificate is missing”
  • “Model ID mismatch between certificate and manual”
  • “Control declaration does not match modelling settings”
  • “Warranty card missing or incomplete”

Checklist

1. Audit Files

  • All residential audit files are present in 05-Audit-File-Preparation (see Audit File Checklist)
  • CER audit structure is correct (if applicable)
  • VEU audit structure is correct (if applicable)
  • ESS audit structure is correct (if applicable)

2. Model Identity

  • System, tank, and HP model IDs are consistent across:
    • AS/NZS 2712 certificate
    • AS/NZS 5125.1 test report
    • AS/NZS 4692 test report
    • Tank drawing
    • Installation manual
    • Data plate image
    • 4234 modelling report

3. Tank Drawing

  • Tank volumes and dimensions reconcile with 4234 Appendix TDS
  • Tank drawing meets EnergyAE requirements (see Document Review)

4. Installation Manual

  • Brand and model name are correct and consistent
  • Control logic default mode matches modelling settings
  • Plumbing schematic is included and clear
  • Warranty information is complete:
    • Covers 5+ years
    • Company details and contact information provided
    • Claim instructions are clear

5. Data Plate

  • System ID matches AS/NZS 2712 certificate
  • Image resolution is adequate (readable text)

6. Declarations

  • Control declaration (if required) matches modelling settings and manual
  • Manufacturer declaration exists if brand/model differs between test report and submission
  • Authorisation letter is included if applicant does not own the test reports

7. Product Upload Form (PUF)

  • PUF data is consistent with source material and modelling
  • Spot check TRNSYS .out files for completeness and plausibility

Gate B Pass

When all checks pass, proceed to scheme submission (CER, VEU, ESS).