2. Testing and Certification

Testing and certification requirements before residential HPWH modelling and scheme applications.

Phase 2 confirms that the project has a credible testing and certification pathway for AS/NZS 4234 modelling, AS/NZS 2712 certification, and scheme applications.

Residential HPWH projects usually require evidence across potable water, electrical safety, tank heat loss, HP performance, annual simulation, and certification. EnergyAE completes the AS/NZS 4234 modelling, but the client, test lab, and certification body usually provide the other evidence.

In this section

Phase sub-tasks

  1. Confirm what testing has already been completed.
  2. Confirm the lab and certification body for any testing/certification still underway.
  3. Sanity-check AS/NZS 5125.1 and AS/NZS 4692 reports before modelling.
  4. Confirm AS/NZS 2712, Electrical Certification & EESS registration status.
  5. Record missing evidence in the project checklist and client follow-up list.

Testing overview

TestStandardPurpose
Potable waterAS 3498, AS 4020Confirms materials and potable water safety evidence for certification and scheme files
Electrical safetyAS/NZS 60335 series, CISPR, IEC 61000 seriesConfirms electrical safety and EMC evidence
Tank heat lossAS/NZS 4692.1 Appendix CSupports tank heat loss inputs and certification
HP performanceAS/NZS 5125.1Supports heat pump performance inputs for AS/NZS 4234 modelling
Annual simulationAS/NZS 4234Calculates annual energy performance and certificate values
CertificationAS/NZS 2712, EESSSupports product certification and scheme eligibility

Email templates

Exit gate

Phase 2 exits when required test reports and certification evidence are received or tracked with clear owners, due dates, and project risk notes.

The next phase is Phase 3 - Documentation Review.