3. Documentation Review
Documentation intake and review process for residential HPWH modelling projects.
Phase 3 confirms that the project documents are complete, internally consistent, and usable for modelling, certification support, and scheme applications.
Residential projects are vulnerable to small identity mismatches: brand names, legal entities, model names, tank volumes, manuals, labels, data plates, and certificates must line up before audit files are prepared.
In this section
- Document Checklist — files required for modelling, integral vs standalone
- Document Review — the specific checks across all documents
- File Structure — the project folder layout
Phase sub-tasks
- Confirm all documents are stored in SharePoint, not scattered through email attachments.
- Review model identity across reports, certificates, drawings, manuals, labels, and data plates.
- Check technical inputs needed for TRNSYS setup and parameter review.
- Check scheme/audit evidence required for CER, VEU, and ESS.
- Send a batched missing-documents follow-up email for gaps or inconsistencies.
Exit gate
Phase 3 exits when required documents are complete enough for modelling and audit preparation, or when any remaining gaps are logged with an owner and due date.
The next phase is Phase 4 - Modelling.