Residential Pre-test Advisory

Client advisory before residential HPWH testing begins.

When to use

Send before AS/NZS 5125.1 or AS/NZS 4692 testing starts, especially where the client or lab is still confirming scope.

Subject

[{AExxx}] {Client} - Pre-test Advisory for Residential HPWH Testing

Template

Hi {ClientName},

Before testing begins, we recommend confirming a few items with the test lab so the reports will support AS/NZS 4234 modelling, AS/NZS 2712 certification, and the target scheme applications.

Our main recommendations are:

  1. Confirm the exact model names and tank volumes that will appear in reports, labels, manuals, certificates, and applications.
  2. Confirm AS/NZS 5125.1 heat pump performance testing will provide the data needed for AS/NZS 4234 modelling.
  3. Confirm AS/NZS 4692.1 tank heat loss evidence is available for each relevant tank model.
  4. Confirm the certification body is comfortable with the test scope for AS/NZS 2712 certification.
  5. Please copy EnergyAE on technical test-condition, scheduling, results, and lab RFI emails.

If any test report is already complete, please upload it to the project SharePoint folder and we will sanity-check it before modelling.

Kind regards,

{SenderName}